皇冠足球网址(www.99cx.vip)_Kelana Jaya LRT line to increase train frequency by August, says transport minister

皇冠足球网址www.99cx.vip)实时更新发布最新最快最有效的皇冠足球网址,包括皇冠手机网址,皇冠备用网址,皇冠最新网址,皇冠足球网址,皇冠网址大全。

,Transport Minister Dr Wee Ka Siong says all repairs on carriages servicing the Kelana Jaya LRT line will be completed in November. – The Malaysian Insight file pic, June 16, 2022.

TRAIN frequency for the Kelana Jaya LRT line is expected to improve by August, Transport Minister Dr Wee Ka Siong said. 

He said it would be improved from eight minutes to at least five minutes after more damaged carriages are repaired.

“We have identified the cause for the damage and now repairs need to be done. So this August would be the interim progress, the frequency would be at five minutes,  and in November we will be able to complete all repairs,” he told a media conference today. 

Earlier, Wee had accompanied Prime Minister  I *** ail Sabri Yaakob for a ride on the Putrajaya Phase 1 Mass Rapid Transit (MRT) line from the Kampung Batu station to Sri Damansara Sentral.

Wee said the Transport Ministry (MOT) had set the August and November target because a lot of preventive maintenance had to be carried out due to safety factors.

MOT apologises to all affected LRT users for the inconvenience, Wee said, adding that the delays were unavoidable in the interest of safety. 

“If we were to keep using (problematic trains) and there are risks… we would not want any untoward incidences,” he said. 

On May 22, Prasarana Malaysia Bhd said it had set up a committee after one of its trains on the Kelana Jaya Line stalled two days earlier due to a brake caliper hydraulic leakage, affecting about 22,100 passengers. – Bernama, June 16, 2022.


转载说明:本文转载自Sunbet。

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。